GSES 1 LIMITED

30 unique locations (210 components) - Page 1 of 2

Active MW: 107.34 MW
Inactive MW: 75.49 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (6 components)

1.200MW of battery storage located at Durham.

Inactive •
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (3 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2028-29 (T-4)
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive •
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (3 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the …

Active • 2028-29 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (8 components)

0.800MW of battery storage located at Wiltshire.

Inactive •
4.65 MW
Carlton, Stockton-on-Tees, TS21 1EA (7 components)

1.200MW of battery storage located at Stockton-on-Tees.

Inactive •
4.65 MW
Carlton, Stockton-on-Tees, TS21 1EA (5 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 …

Inactive •
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (7 components)

Purpose Build Battery designed to be compliant in the FFR market.

Inactive •
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (6 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive •
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (6 components)

1.200MW of battery storage located at Preston.

Inactive •
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (6 components)

1.200MW of battery storage located at Preston.

Inactive •
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (7 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Inactive •
Ferrymuir Farm, Cupar, KY15 5RW (4 components)

49.900MW one-hour duration battery energy storage facility.

Inactive •
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (5 components)

1.000MW of battery storage located at Staffordshire.

Inactive •
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (4 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2026-27 (T-4), 2027-28 (T-4) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (6 components)

1.200MW of battery storage located at Hook.

Inactive •
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2028-29 (T-4)
Land North of Clayhill Farm, Westoning MK45 5JD (8 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Land North of Clayhill, Westoning, MK45 5JD. (6 components)

1.200MW of battery storage located at Westoning.

Inactive •
Larport Farm Larport Lane Dormington Hereford HR1 4EP (14 components)

19.500 MW of battery storage located at Hereford.

Inactive •
16.44 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
Lascar Works, Tanpits Road, Bury, BL9 5BY (6 components)

20.000MW of battery storage located at Lascar Works

Inactive •
17.23 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (19 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Inactive •
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)

1.200MW of battery storage located at Durham.

Inactive •
Loading map...
Showing 25 locations